Skip to main content
ubuntuask.com

Back to all posts

How to Run Pytest Tests In Parallel?

Published on
4 min read
How to Run Pytest Tests In Parallel? image

Best Parallel Testing Tools to Buy in October 2025

1 Rahish Tools 3MT Parallel Lathe Alignment Test Bar with High Precision Bar Alloy Steel EN31 Mandrel - Tailstock Re-Alignment Tool with 1 Micron Accuracy & Morse Taper with Max Run-Out of 0.0001"

Rahish Tools 3MT Parallel Lathe Alignment Test Bar with High Precision Bar Alloy Steel EN31 Mandrel - Tailstock Re-Alignment Tool with 1 Micron Accuracy & Morse Taper with Max Run-Out of 0.0001"

  • ACHIEVE 1 MICRON ACCURACY FOR FLAWLESS LATHE MACHINING RESULTS.

  • DURABLE ALLOY STEEL DESIGN ELIMINATES TAPER ERRORS DURING TURNING.

  • ESSENTIAL FOR PRECISE TAILSTOCK ALIGNMENT, BOOSTING PRODUCTIVITY.

BUY & SAVE
$31.99
Rahish Tools 3MT Parallel Lathe Alignment Test Bar with High Precision Bar Alloy Steel EN31 Mandrel - Tailstock Re-Alignment Tool with 1 Micron Accuracy & Morse Taper with Max Run-Out of 0.0001"
2 Yunnergo 10 Pairs Precision Parallel Set 1/8" x 6" Accuracy 0.0002" Thin Steel

Yunnergo 10 Pairs Precision Parallel Set 1/8" x 6" Accuracy 0.0002" Thin Steel

  • SUPERIOR QUALITY ALLOY STEEL FOR UNMATCHED DURABILITY AND PERFORMANCE.
  • ACHIEVE PRECISE MEASUREMENTS WITH ACCURACY OF +/- 0.0002.
  • ORGANIZED PLASTIC CASE OFFERS CONVENIENT STORAGE AND EASY ACCESS.
BUY & SAVE
$35.46
Yunnergo 10 Pairs Precision Parallel Set 1/8" x 6" Accuracy 0.0002" Thin Steel
3 Aspaton 10 Pairs 1/8" x 6" Precision Parallel Steel Set Accuracy 0.0002" Thin Steel, Precision Machinist Tools 1/2 inch to 1-5/8 inch

Aspaton 10 Pairs 1/8" x 6" Precision Parallel Steel Set Accuracy 0.0002" Thin Steel, Precision Machinist Tools 1/2 inch to 1-5/8 inch

  • PRECISION ENGINEERING: ACHIEVE ACCURACY OF +/- 0.0002 FOR FLAWLESS RESULTS.

  • VERSATILE HEIGHTS: INCLUDES 10 SIZES FROM 1/2 TO 1-5/8 FOR EVERY JOB.

  • DURABLE DESIGN: HARDENED THIN STEEL ENSURES LONGEVITY AND PERFORMANCE.

BUY & SAVE
$37.60
Aspaton 10 Pairs 1/8" x 6" Precision Parallel Steel Set Accuracy 0.0002" Thin Steel, Precision Machinist Tools 1/2 inch to 1-5/8 inch
4 Accusize Industrial Tools 1/8'' Thickness 10 Pairs Precision Parallel Sets, 6'' Length, Eg10-1400

Accusize Industrial Tools 1/8'' Thickness 10 Pairs Precision Parallel Sets, 6'' Length, Eg10-1400

  • ULTRA-PRECISE ACCURACY: +/-0.0002 PARALLELISM, +/-0.0001 HEIGHT.
  • DURABLE ALLOY STEEL: HARDENED AND GROUND FOR ULTIMATE PERFORMANCE.
  • VERSATILE RANGE: COVERS WIDTHS 1/2 TO 1-5/8 FOR DIVERSE SETUPS.
BUY & SAVE
$65.36
Accusize Industrial Tools 1/8'' Thickness 10 Pairs Precision Parallel Sets, 6'' Length, Eg10-1400
5 Saysurey Parallel Ruler Marine Navigation Tool with Clear Scales Parallel Ruler with Brushed Aluminum Arms Nautical Charts Navigation Tools for Boat Ship Drawing(12 Inch)

Saysurey Parallel Ruler Marine Navigation Tool with Clear Scales Parallel Ruler with Brushed Aluminum Arms Nautical Charts Navigation Tools for Boat Ship Drawing(12 Inch)

  • PLOT ACCURATE BEARINGS EASILY: PERFECT FOR MARINE NAVIGATION AND COURSE LINES.
  • BUILT TO LAST: DURABLE ACRYLIC AND ALUMINUM DESIGN WITHSTANDS FREQUENT USE.
  • PRECISION AT YOUR FINGERTIPS: CLEAR, ENGRAVED SCALES FOR ULTIMATE ACCURACY.
BUY & SAVE
$18.99 $20.99
Save 10%
Saysurey Parallel Ruler Marine Navigation Tool with Clear Scales Parallel Ruler with Brushed Aluminum Arms Nautical Charts Navigation Tools for Boat Ship Drawing(12 Inch)
6 HHIP 3900-3002 1/8 x 4" 10 Pair Precision Parallel Set

HHIP 3900-3002 1/8 x 4" 10 Pair Precision Parallel Set

  • FINE QUALITY TOOL STEEL, STRESS-RELIEVED FOR DURABILITY.
  • PRECISION-GROUND AND HARDENED FOR ULTIMATE ACCURACY.
  • COMES WITH A DURABLE PLASTIC CASE FOR EASY STORAGE.
BUY & SAVE
$33.96 $59.10
Save 43%
HHIP 3900-3002 1/8 x 4" 10 Pair Precision Parallel Set
7 BLUEFOX TOOLS Lathe Alignment Test Bar 400mm (15-3/4") Parallel Shank Mandrel Wooden Box

BLUEFOX TOOLS Lathe Alignment Test Bar 400mm (15-3/4") Parallel Shank Mandrel Wooden Box

  • ACHIEVE 2-MICRON ACCURACY FOR PRECISE MACHINING RESULTS.
  • MAX RUN-OUT OF 0.0001 ENSURES EXCEPTIONAL PERFORMANCE.
  • DURABLE DESIGN: HARDENED AND GROUND FOR LONG-LASTING USE.
BUY & SAVE
$118.99
BLUEFOX TOOLS Lathe Alignment Test Bar 400mm (15-3/4") Parallel Shank Mandrel Wooden Box
8 Klein Tools RT390 Circuit Analyzer with Large LCD, Identifies Wiring Faults, GFCI and AFCI Tester, Voltage Drop, Displays Trip Time

Klein Tools RT390 Circuit Analyzer with Large LCD, Identifies Wiring Faults, GFCI and AFCI Tester, Voltage Drop, Displays Trip Time

  • CLEAR LCD DISPLAY FOR EASY WIRING FAULT ANALYSIS
  • DETECTS COMMON & DUAL WIRING FAULTS FOR MAXIMUM SAFETY
  • LOAD TESTING FOR ACCURATE VOLTAGE DROP INSIGHTS
BUY & SAVE
$159.99
Klein Tools RT390 Circuit Analyzer with Large LCD, Identifies Wiring Faults, GFCI and AFCI Tester, Voltage Drop, Displays Trip Time
+
ONE MORE?

To run pytest tests in parallel, you can use pytest-xdist plugin which allows you to run tests in parallel on multiple CPUs. First, install the plugin using pip:

pip install pytest-xdist

Then, you can specify the number of CPUs to use by passing the -n option followed by the number of CPUs. For example, to run tests on 4 CPUs:

pytest -n 4

This will divide your tests among the available CPUs and run them in parallel, speeding up the execution time. Note that not all tests may be suitable for parallel execution, so it's important to test and verify the results when running tests in parallel.

What are some considerations for running tests in parallel in a containerized environment?

  1. Resource constraints: Ensure that there are enough resources available in the containerized environment to run tests in parallel without affecting the performance of other containers or services.
  2. Dependencies: Make sure that dependencies required for running tests in parallel are available in the containerized environment. This includes test environments, data sources, and external services.
  3. Isolation: Ensure that each test is isolated from the others to prevent interference and to maintain the integrity of the test results.
  4. Scalability: Consider the scalability of the containerized environment to accommodate running tests in parallel as the number of tests increases.
  5. Monitoring and reporting: Implement monitoring and reporting mechanisms to track the progress and results of the tests running in parallel in the containerized environment.
  6. Coordination: Manage the coordination of parallel tests to prevent race conditions and conflicts between tests that may impact the accuracy of the results.
  7. Tooling: Use appropriate testing frameworks and tools that support running tests in parallel in a containerized environment.
  8. Security: Ensure that security measures are in place to protect the tests and data being processed in the containerized environment.

How do I scale parallel testing for large test suites?

Scaling parallel testing for large test suites can be achieved through a few key strategies:

  1. Divide and conquer: Break down your large test suite into smaller, more manageable chunks that can be run in parallel. This can involve splitting tests based on functionality, risk level, or any other relevant criteria. This way, multiple smaller test suites can be run simultaneously, speeding up the overall testing process.
  2. Use parallel test execution frameworks: There are various tools and frameworks available that can help manage and run tests in parallel. These frameworks can help distribute tests across multiple machines or devices, allowing for faster execution of tests.
  3. Prioritize tests: Not all tests are created equal – some tests may be more critical or time-consuming than others. Prioritize tests based on importance and run critical tests in parallel to identify issues quickly.
  4. Optimize test execution: Look for opportunities to optimize the execution of tests, such as reducing dependencies between tests, maximizing resource allocation, and minimizing unnecessary duplication of test runs.
  5. Monitor and analyze performance: Keep track of the performance of your parallel testing setup and continuously monitor and analyze results. Look for bottlenecks or inefficiencies that may be slowing down the testing process and make adjustments as needed.

By implementing these strategies, you can successfully scale parallel testing for large test suites and improve the efficiency of your testing process.

What are the limitations of running pytest tests in parallel?

  1. Dependencies between test cases: Some test cases may need to be run sequentially due to dependencies or shared resources. Running them in parallel may lead to conflicts and unreliable results.
  2. Race conditions: Running tests in parallel can create race conditions where multiple tests try to access or modify the same resources concurrently, leading to unexpected outcomes.
  3. Resource constraints: Running tests in parallel requires more resources such as CPU and memory, which may not be readily available in all testing environments.
  4. Debugging issues: When tests are run in parallel, it can be more difficult to identify the root cause of failures or issues as they may be occurring simultaneously in different test cases.
  5. Test case isolation: Running tests in parallel may make it challenging to isolate specific test cases for debugging or analysis, as they are all running concurrently.